Fleet & operations
Capacity that moves with the programme.
Production plants, delivery vehicles, pumping resources, support fleet and people are coordinated through a central operating function.
Resource platform
Production, placement and support.
The published fleet reflects the integrated resources planned for high-volume concrete supply and site support across Dubai.
| Resource | Quantity | Capacity / specification | Operating role |
|---|---|---|---|
| Automated batching plants | 4 | 200 m³/hour each | Computer-controlled ready-mix concrete production |
| Transit mixers | 60 | 12 m³ each | Scheduled delivery from plant to project site |
| Boom pumps | 10 | 42–70 m reach range | Mobile pumping for reach and high-output placement |
| Placing pumps | 10 | Project-specific placing configuration | Site placement support for defined pour arrangements |
| Stationary concrete pumps | 5 | High-output stationary configuration | Fixed pumping arrangements and sustained placement |
| Ice Plant System | 1 | Approx. 120 tons/day | Ice production for temperature-controlled concrete |
| Chilled-Water Plant | 1 | Approx. 400 m³/day, including storage & pumping system | Chilled-water supply for controlled concrete temperature |
| Aggregate Tipper Semi-Trailer Sets | 15 | 6×4 tractor head + 3-axle, 45 m³ rear-tipping semi-trailer | Aggregate transport and plant supply logistics |
| Bulk Cement Tanker Sets | 5 | Tractor + 50–60 m³ pneumatic bulk cement tanker | Bulk cement transport and silo replenishment |
| Wheel Loaders | 2 | Approx. 5-ton payload / 3 m³ bucket | Plant-yard and aggregate material handling |
| Technician Pickup Trucks | 10 | 1.5-ton class, for pump/site technical support | Tools, maintenance and rapid technical response |
| Staff buses | 3 | 45 seats each | Workforce transport |
| Minibuses | 3 | 14 seats each | Technical and operational team transport |
| Administrative & technical vehicles | 25 | Mixed light-vehicle fleet | Management, supervision and technical support |
| Total workforce | 250 | Skilled, general, administrative and technical personnel | Production, delivery, HSE, customer support and corporate functions |
Central dispatch
Resources are valuable only when coordinated.
The dispatch function connects batching, mixer allocation, route conditions, site readiness and pumping availability. This helps maintain delivery sequence and respond quickly when site conditions change.
- Order and batching schedule visibility
- Mixer assignment and delivery sequencing
- Pump allocation and site coordination
- Operational communication across the supply chain
Fleet readiness
Maintenance supports delivery reliability.
Preventive maintenance, inspection and workshop support are essential to fleet availability. Planned maintenance helps protect vehicle condition, reduce disruption and keep production assets connected to the project site.